09/01/2013
RANS S-20 RAVEN
TEXT MANUAL
00-40
S-20 FUSELAGE – FINAL ASSEMBLY
Refer to Section 1 and complete the following items:
•
MAIN GEAR ASSEMBLY AND INSTALLATION
o FINAL INSTALLATION
•
TAIL WHEEL / NOSE GEAR ASSEMBLY AND INSTALLATION
Refer to Section 2 and complete the following items:
•
CONTROL STICK ASSEMBLY AND INSTALLATION
o TORQUE TUBE FIT UP
o FINAL ASSEMBLY AND INSTALLATION
•
ELEVATOR PUSH PULL TUBE ASSEMBLY
Refer to flow plan section
TAIL SURFACES FINAL ASSEMBLY AND INSTALLATION
•
Complete all items listed.
Refer to Section 2 and complete the following items:
•
AILERON CABLE SYSTEM INSTALLATION - FUSELAGE
•
FLAP LEVER ASSEMBLY AND INSTALLATION
Refer to Section 6 and complete the following items:
•
BOOT COWL AND INSTRUMENT PANEL INSTALLATION
o
BOOT COWL
o
INSTRUMENT PANEL FIT UP
Refer to Section 1 and complete the following items:
•
FLOORBOARD INSTALLATION
o INSTALLATION
•
RUDDER PEDAL INSTALLATION
•
FIREWALL ASSEMBLY AND INSTALLATION
o ASSEMBLY
o INSTALLATION
•
HYDRAULIC BRAKE INSTALLATION
o
PARK BRAKE
o
BRAKE PEDALS AND CYLINDERS
•
RUDDER SYSTEM ASSEMBLY AND INSTALLATION
o FINAL INSTALLATION