![Rans S-20 RAVEN Text Manual Download Page 156](http://html1.mh-extra.com/html/rans/s-20-raven/s-20-raven_text-manual_3669201156.webp)
RANS S-20 RAVEN
TEXT MANUAL
09/01/2013
06-05
VENT SYSTEM INSTALLATION
(BEFORE COVERING AND PAINTING)
36.
Refer to the parts catalog and select the required components.
37.
Position NACA scoop of Vent System centered on Side Skin cutout.
Transfer Drill #30 through Side Skins. Cleco in place.
38.
Recommended location for openings in Instrument Panel for eyeball vents
is shown in
FIGURE 06-38
. Use as a 1:1 template. An alternate method is
to cut the large opening and place eyeball vent behind panel to locate the
perimeter holes.
39.
Use the eyeball vent and transfer drill through the hose adaptor flange.
40.
After mounting the Instrument Panel in the Panel Frame, route the duct
hose and cut to length as needed.
41.
Remove assembly and set aside for installation after covering and
painting.
INSTALLATION
(AFTER COVERING, PAINTING AND INSTALLATION OF BOOT COWL)
42.
Apply Silicon Seal to mounting flange of NACA scoop. Rivet to inside of
Boot Cowl Side Skin.
43.
Install Instrument Panel with eyeball vent and hose adaptor installed.
44.
Attach duct hose and secure with hose clamps.