RAINBOW ROBOTICS
RB SERIES _ USER MANUAL
© RAINBOW ROBOTICS Inc. All rights reserved.
365
CHAPTER
10.
MAINTENANCE
10.1
CHECK
LIST
AND
PERIOD
The robot requires regular maintenance to perform in the best condition. As such, a regular
maintenance schedule is highly recommended. During maintenance, the following check list
has to be done. If you find a problem that cannot be solved by yourself, contact the
manufacturer.
Check
Item
Check Point
Period
Robot
Arm
Robot
Check that the robot moves to the
desired location properly.
Daily
Check that the robot keeps its pose
between being turned on and off.
Remove stains, dust, and any foreign
objects.
Every
3
months
Motor
Check if a joint becomes irregularly hot
or noisy
Daily
Screws Check that all screws on the body are
tightened
Every
3
months
Control
Box
Cable
Check the connection of cables
Every
6
months
In-Box
Remove dust in the control box.
Warning:
1)
During maintenance, cut off the power to the system (Control Box and Robot Arm)
and perform work.
2)
For pneumatic/electric line passing models, remove the connected energy source
(pneumatic/electric power) and perform the work.
Summary of Contents for RB Series
Page 1: ...RAINBOw English RB SERIES USER MANUAL V 3 9 1 Update 2021 09...
Page 2: ...RAINBOW ROBOTICS RB SERIES _ USER MANUAL RAINBOW ROBOTICS Inc All rights reserved 2...
Page 195: ...RAINBOW ROBOTICS RB SERIES _ USER MANUAL RAINBOW ROBOTICS Inc All rights reserved 195...
Page 206: ...RAINBOW ROBOTICS RB SERIES _ USER MANUAL RAINBOW ROBOTICS Inc All rights reserved 206...
Page 265: ...RAINBOW ROBOTICS RB SERIES _ USER MANUAL RAINBOW ROBOTICS Inc All rights reserved 265...