Setup
Placement
CubiScan 110-T
8
2. Turn all three of the shipping bolts clockwise until the head is tight
against the scale plate.
3. Tip the CubiScan 110-T back to its upright position.
Placement
The CubiScan 110-T is designed to be operated in a warehouse
environment; however, for proper operation the following conditions
should be met if possible.
•
Do not subject the CubiScan to extremes in temperature or humidity.
Locate the CubiScan as far from open freight doors as possible. Heaters
or air conditioners should not blow directly on the CubiScan.
•
Protect the CubiScan from static electricity, especially the control panel.
•
Place the CubiScan on a flat, sturdy surface as free from vibration as
possible. Excess vibration can reduce the accuracy of the CubiScan 110-T
scale.
•
The CubiScan’s platform is free-floating—it is resting on a spring (load
cell). Maintain a minimum of one-inch clearance at the back and sides of
the CubiScan. Do not rest objects against or set objects on the CubiScan
when not in use.
Figure 5
Shipping Bolts
Before
After
Shipping Bolt Locations