2000-Sheet
Large-Capacity
Output Stacker
C-19
Installing Options
18 Turn the two front levelers counter-clockwise to tilt the top of
the LCOS securely against the printer.
19 Plug the signal cable form the LCOS into the connector on
the rear bottom-right of the back of the printer.
»
Note:
Make sure the main power switch is in the off position.