Pratt & Whitney Rzeszów S.A.
MAINTENANCE MANUAL
PZL-10W ENGINE
2015.12.30
72-02-00
Page 603
Export Control Classification: PL/UE 9E999
2.
Daily inspection.
This kind of maintenance consists of two process groups:
A.
Before flight maintenance: includes the procedures, which shall be done before the
first flight of the day.
NOTE:
If, in exceptional circumstances, the pre-flight maintenance is difficult to
complete (e.g. due to continuous standby, long-term rescue operations,
etc. of the aircraft), it is permitted to perform the pre-flight maintenance
exclusively at the start of the concerned period, but at least every 5
calendar days.
B.
After flight maintenance:
includes the procedures, which shall be done after the last
flight of the day.
The list of procedures to perform in each of a/m groups is presented.by the TABLE 601.
The sign (+) means, that the procedure belongs to this maintenance group.
TABLE 601. Engine daily inspection.
No.
PROCEDURE
PERFORMING IN
ACCORDANCE TO
MAINTENANCE PROCEDURE
RANGE
BEFORE
FLIGHT
AFTER FLIGHT
1
Outside engine inspection
71-02-00,
ADJUSTMENT/TEST
item 2
+
Note 1.
+
2
Check the oil filter contamin.
indic, position
79-02-00,
CLEANING/PAINTING
item 2.A
+
Note 4
+
3
Compressor washing to
remove the sea salt
71-02-00,
CLEANING/PAINTING
item 1
-
+
Note 2.
4
Engine check
71-02-00,
ADJUSTMENT/TEST
item 4
+
Note 3.
-