Pratt & Whitney Rzeszów S.A.
MAINTENANCE MANUAL
PZL-10W ENGINE
1992.08.28
77-02-00
Page 401
Export Control Classification: PL/UE 9E999
MONITORING INSTRUMENTS FOR ENGINE OPERATION - REMOVAL AND INSTALLATION
1.
General information.
A.
The engine manufacturer installs the MCTB-1,1 A; MCTB-0,1 A; MCTB-0,5AC pressure signalling
devices (see 72-02-00, DESCRIPTION AND OPERATION, Dwg 2, items 13, 21, 22) on the engine.
The procedure of the removal and installation of these signalling devices is described below. The
remaining pressure signalling devices situated on the engine are installed by the helicopter
manufacturer in accordance with the Helicopter Maintenance Manual.
B.
Before installation of new signalling device, check if its type is the same as this one removed. The
installation of different signalling device type may cause improper operation the signalling system
involved.
2.
Removal and installation of the MCTB-1,1A and MCTB-0,1A pressure signaling devices (Dwg 401 ).
A.
Pressure signaling device removal.
(1 )
Unsecure and unscrew the nut (1) of the electric lead plug. Disconnect the electric lead from
the signalling device.
(2)
Unsecure and unscrew the nut (6) of the pipe and next the nut (5).
(3)
Remove the signalling device (2) from the bracket (3).
B.
Pressure signalling device installation.
NOTE:
The damper is screwed into the stub of the MCTB-0,1A signalling device, which is secured
against slipping out the stub by rolling (decreasing of the diameter) the hole on the cone
end. In the case of new signalling device installation, check if in a/m stub is there screwed
in (or screw in) the damper attached to the signalling device.
It is recommended to use the MCTB-0,1A signalling devices assigned to signal the
operation of the air bleed valve from behind compressor Vl-th stage with the dampers
rolled by the engine manufacturer.
(1 )
Place the signalling device (2) on the bracket (3).
(2)
Place the washer (4), nut (5) and pipe (6) on the signalling device stub. Tighten next the pipe
(6) nut and nut (5) by hand.
(3)
Screw on the plug (1 ) nut of the electric lead on the signalling device (2) and safety wire.
(4)
Tighten the nuts (5) and (6) with the wrench and safety wire.
NOTE:
Pay attention if you do not twist the electric leads during the tightening of the nut (5).