7
7.13
9924707 - 2013–2014
RZR
800 Service Manual
© Copyright 2013 Polaris Sales Inc.
4.
Install the upper ball joint end into the front bearing
carrier.
5.
Install
the
upper
pinch
bolt
and
torque
to
specification.
Ball Joint Pinch Bolts:
23 ft-lbs (31 Nm)
6.
Apply grease to drive shaft axle splines.
7.
Install front wheel hub assembly, cone washers, and
hand tighten the castle nut. Install washers with
domed side out.
8.
Torque wheel hub nut to specification and install a
new
cotter pin. Tighten nut slightly if necessary to
align cotter pin holes.
Wheel Hub Castle Nut:
80 ft-lbs (108 Nm)
9.
Install brake caliper mounting bolts and torque to
specification.
Front Caliper Mounting Bolts:
31-34 ft-lbs (42-46 Nm)
FINAL DRIVE
Summary of Contents for RZR 800 2013
Page 4: ......
Page 6: ......
Page 136: ...3 74 9924707 2013 2014 RZR 800 Service Manual Copyright 2013 Polaris Sales Inc NOTES ENGINE...
Page 486: ...IX 6 9924707 2013 2014 RZR 800 Service Manual Copyright 2013 Polaris Sales Inc...
Page 487: ...2013 2014 RANGER RZR 800...
Page 488: ...2013 2014 RANGER RZR 800...
Page 489: ...2013 2014 RANGER RZR 800 EPS...
Page 490: ...2013 2014 RANGER RZR 800 EPS...
Page 491: ...2013 2014 RANGER RZR S 800...
Page 492: ...2013 2014 RANGER RZR S 800...
Page 493: ...2013 2014 RANGER RZR S 800 INT L...
Page 494: ...2013 2014 RANGER RZR S 800 INT L...
Page 495: ...2013 2014 RANGER RZR 4 800...
Page 496: ...2013 2014 RANGER RZR 4 800...
Page 497: ...2013 2014 RANGER RZR 4 800 EPS...
Page 498: ...2013 2014 RANGER RZR 4 800 EPS...