9.34
9850060 R02 - 2020-2021 850 AXYS™ Long Track Snowmobile Service Manual
© Copyright Polaris Inc.
8. Once the adhesive bond is broken, remove the left-
side bulkhead clip from the chassis.
NOTICE
If the component is to be re-used, the adhesive must be
completely removed. See Bonded Component Surface
Preparation section.
BULKHEAD CLIP INSTALLATION, LEFT
NOTICE
Thoroughly read and understand the Adhesive
Applicator Tool and Adhesive Application sections
before proceeding.
1. Verify the bulkhead clip and engine side support
brace are thoroughly cleaned and all residual
adhesive is removed from both parts.
2. Gather the fasteners that secure the bulkhead clip to
the engine side support brace.
3. Apply the adhesive to the front, left engine side
support brace as outlined in Adhesive Application
Patterns page 9.23.
4. Install the bulkhead clip. Loosely install the fasteners
q
-
r
that attach the bulkhead clip.
5. Torque fasteners to specification.
TORQUE
Front Lower Over Structure / Crossover Tube Fastener
q
:
22 ft-lbs (30 Nm)
Side Support Fasteners
w
:
26 ft-lbs (35 Nm)
Clip Mounting Fasteners
e
:
26 ft-lbs (35 Nm)
Lower Steering Mount Fasteners
r
:
22 ft-lbs (30 Nm)
NOTICE
The fasteners must be torqued within the adhesive
working time of 6 to 10 minutes.
6. Reinstall the following components:
• Bulkhead Floor Plate (SeeBulkhead Floor Plate
• Engine assembly (See Engine Installation page
)
• Left side front suspension components (See the
Steering and Suspension Chapter)
• Tie rod boot
NOTICE
Allow the adhesive to cure for 24 hours at 68° F (20° C)
before placing the snowmobile back into service.
Summary of Contents for 850 PRO-RMK 155 2.6" QD 2021
Page 6: ......
Page 738: ......
Page 739: ......
Page 741: ...850 Long Track Jumper Console Switches 2413927 ...