3.40
9850060 R02 - 2020-2021 850 AXYS™ Long Track Snowmobile Service Manual
© Copyright Polaris Inc.
9. Connect the throttle cable
r
and secure the cable
onto the throttle body
t
.
TORQUE
Throttle Cable Lock Nut:
44 in-lbs (5 Nm)
10. Connect the TPS sensor connector
y
to the wiring
harness and install on the connector placement
bracket.
11. Connect the fuel lines
u
on the mag side of the
engine by latching the disconnect locks on the lines.
IMPORTANT
Perform a push/pull test on the fuel line connections
with at least 5 lbs. of force. Connections should NOT
disengage during push/pull test.
12. Install the coolant hose onto the cylinder head.
13. If the water pump cover was removed, install it at this
time.
TORQUE
Water Pump Cover Fasteners:
9 ft-lbs (12 N·m)
14. Install the coolant line(s) on the water pump housing
cover.
15. If the vehicle is equipped with Electric start install the
starter motor, pinion / pinion bracket assembly, and
flex drive. See Starter Motor / Flex Drive Service
page 10.91.
Summary of Contents for 850 PRO-RMK 155 2.6" QD 2021
Page 6: ......
Page 738: ......
Page 739: ......
Page 741: ...850 Long Track Jumper Console Switches 2413927 ...