User’s Manual of GS-4210-16T2S_24T2S_16P2S_24P2S_48T4S
35
Step 5:
Supplying power to the Managed Switch.
Connect one end of the power cable to the Managed Switch and the power plug of the power cable to a standard wall
outlet. When the Managed Switch receives power, the Power LED should remain solid Green.
2.2.2 Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follow the instructions described below.
Step1:
Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step2:
Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.
Figure 2-1-15
shows how to attach brackets to one side of the Managed Switch.
Figure 2-1-15:
Attach Brackets to the Managed Switch
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step 3:
Secure the brackets tightly.
Step 4:
Follow the same steps to attach the second bracket to the opposite side.
Step 5:
After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack
,
as shown in
Figure 2-1-16
.