![Pepperl+Fuchs ICE1 G60L-C1-V1D Series Manual Download Page 11](http://html1.mh-extra.com/html/pepperl-fuchs/ice1-g60l-c1-v1d-series/ice1-g60l-c1-v1d-series_manual_1527934011.webp)
ICE1-*-G60L-V1D, ICE1-*-G60L-C1-V1D
Product Description
2
0
1
9
-1
0
11
PROFINET Displays
P area: relevant LEDs Lnk/Act, BF, DIA
EtherCAT Displays
EC area: relevant LEDs X01, X02 , RUN, ERR
Operating Elements
LED
Function
LED Lnk/Act
Green: connection to an Ethernet node
Flashing yellow: data exchange with an IO device
Off: no connection
LED BF
Red: no configuration, slow or no physical connection
Flashing red: no data exchange with IO device
Off: no error
LED DIA
Red: watchdog timeout or diagnosis occurring, or system error
Flashing red for 3 sec: DCP signal service triggered via the bus
Off: no error
Table 2.3
LED
Function
LED X01
Green: connection to an Ethernet node
Flashing yellow: data exchange with an IO device
Off: no connection
LED X02
Green: connection to an Ethernet node
Flashing yellow: data exchange with an IO device
Off: no connection
LED RUN
Green: OPERATIONAL status
1 x flashing green: SAFE OPERATIONAL status
Flashing green: PRE-OPERATIONAL status
Flickering green: module is starting up and is not yet in INIT state, or
module is in BOOTSTRAP state and is loading firmware.
Off: INIT status
LED ERROR
Red: control error, e.g., PDI watchdog timeout
Flickering: error during booting
Flashing red: incorrect configuration; general configuration error
1 x flashing red: local error, undesired status change
2 x flashing red: watchdog error
Off: no error
Switch
Function
Rotary switch X100
Setting the fieldbus protocol
Setting the IP address
1
1. Only EtherNET/IP
Rotary switch X10
Setting the IP address
Rotary switch X1
Setting the IP address
Note
Details on setting the protocol and the IP address can be found in the chapter "Commissioning,
Protocol Setting
”