MECH-8
1-13. A/C Head Adjustment Method (Summery)
Adjustment
Item
Screw Adjustment
Method
Torque
Tilt Adj.
A
1) Adjust screw (A) after loosen screw (G).
Counter clockwise (Tighten) --- Decrease Cue Level.
Clockwise (Loosen)--- Increase Cue Level
2) Tighten screw (G) after finishing adjusting the screw (A).
(Refer to following item “Azimuth Fix”.)
(Adjustment)
Azimuth Adj.
F
1) Phase is adjusted by screw (F) after loosen screw (G).
2) Tighten screw (G) after finishing adjusting the screw (F).
(Refer to following item “Azimuth Fix”.)
(Adjustment)
Azimuth Fix
G
Screw (G) should always be tightened during adjustment except Tilt and
Azimuth adjustments.
10cN·m
(1.0Kgf·cm)
Height Adj.
B
Counter clockwise (Tighten): In case CTL level increases by pressing down
the A/C Head.
Clockwise (Loosen): In case CTL level increases by lifting up the A/C Head.
NOTE 1: Please refer to figure 1-13-2 for the portion to lift up and press
down the A/C Head.
NOTE 2: To lift up and press down A/C Head, do it gently by finger.
(Adjustment)
Height Fix
H
After the height adjustment, tighten screw (H) to fix height of A/C Head.
25cN·m
(2.5Kgf·cm)
X-Value Adj.
C, D
1) Adjust X-Value at Hole (E) by VFK0357, then tighten the screw (C)
and (D) to fix A/C Head horizontal position.
2) Tap the portion shown in the fig. 1-13-3 to confirm the phase shift.
25cN·m
(2.5Kg·cm)
Screw Tool
for
Adjustment
B
VFK1150A (5.5mm Nut Driver)
A, F
VFK1178A (0.89mm Hex Driver)
C, D, G, H
VFK1148A (1.5mm Hex Driver)
Hole E
VFK0357 (Eccentric Driver)
Figure 1-13-3
A/C Head X-Value Adjustment
Figure 1-13-1
A/C Head Adjust Screws
H
G
A/C HEAD
F
D
C
B
E A
Figure 1-13-2
A/C Head Height Confirmation
B
H
Press Down
Lift Up
D
E
C
Tap here
Summary of Contents for AJ-YA120AG
Page 3: ... 3 ...
Page 4: ... 4 AJ HD1200AE ...
Page 5: ... 5 ...
Page 6: ... 6 AJ YA120AG AJ YAD120AG ...
Page 8: ... 8 AJ HD1200AP ...
Page 9: ... 9 ...
Page 10: ... 10 AJ HD1200AE ...
Page 11: ... 11 ...
Page 12: ... 12 AJ YA120AG AJ YAD120AG ...
Page 13: ...FCD0405NTKK67E494E495 ...
Page 312: ...73 73 73 73 31 95 89 MECHANICAL CHASSIS ASSEMBLY 1 MPL 1 ...
Page 314: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Page 316: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Page 318: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Page 493: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Page 552: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Page 554: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Page 556: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Page 634: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...