MECH-12
1-18. REV Tape Path Confirmation
and Adjustment
(T6 Post Height)
ADJ.
T6 Post Height
TP
TP4: A PROC Board (Slot 2)
MODE
25M PLAY (+1)
25M REV (-1):
TAPE
VFM3582KM or VFM3582KL
TOOL
VFK1148A (Post Driver)
SPEC.
C1
≥
Cp1 x 0.75
C2
≥
Cp2 x 0.75
Lower limit at T5 post in REV –1.0 mode.
Tape has no curl and bent at T5 and T6
Post.
<How to place the VTR in the REV -X1>
1) Open the service menu.
2) Press the both “PLAY” and “REW” button
together in the VTR operation mode.
1. Perform 1x and –1x playback alternately. Confirm
the CTL output level is within the specification in
the figure 1-18-1. If it is out of specification, adjust
the T6 Post Height.
2. When adjusting a post, try it by 45 degrees step.
3. Place the unit in the –x1 playback again, and
confirm that the CTL output level (C1/ C2) is more
than 75% of the normal playback (CP1/ CP2).
Also confirm that the limit condition of the P5 and
P6 posts is as shown in figure 1-18-1.
4. If it is out of specification, adjust T6 post height.
“1-2. Post Height Pre-Adjustment”.
< Post Limit >
Post A B C D E F
T5
NG NG OK NG NG NG
T6
OK OK OK NG NG NG
Figure 1-18-1
Figure 1-18-2
1-19. Long PLAY Tape Damage
Confirmation CUE/REV
Damage Confirmation
MODE
Change CUE and REV x-1 mode alternately
TAPE
Long PLAY Tape L-Cassette (Beginning)
(AJ-5P93LP: Recorded Tape)
SPEC.
No damage on the tape at T5 and T6 posts
1. Prepare a 50M recorded tape.
Confirm that there is no tape damage in
intermittent mode and while switching CUE and
REV.
2. If it is out of specification, adjust T5 and T6 posts
height by following the Paragraph “1-2. Post Height
Pre-Adjustment”.
Note :
See page MECH-1 for post location.
A: UPPER
B: FREE
C: LOWER
D: CURL
E: BEND
F: DROP
C1, C2: SHTL x-1
Cp1, Cp2: PLAY x1
Summary of Contents for AJ-YA120AG
Page 3: ... 3 ...
Page 4: ... 4 AJ HD1200AE ...
Page 5: ... 5 ...
Page 6: ... 6 AJ YA120AG AJ YAD120AG ...
Page 8: ... 8 AJ HD1200AP ...
Page 9: ... 9 ...
Page 10: ... 10 AJ HD1200AE ...
Page 11: ... 11 ...
Page 12: ... 12 AJ YA120AG AJ YAD120AG ...
Page 13: ...FCD0405NTKK67E494E495 ...
Page 312: ...73 73 73 73 31 95 89 MECHANICAL CHASSIS ASSEMBLY 1 MPL 1 ...
Page 314: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Page 316: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Page 318: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Page 493: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Page 552: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Page 554: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Page 556: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Page 634: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...