MECH-30
2-6. Replacement of Capstan Unit
(Removal)
1. Disconnect the connector on the MECHA I/F Board.
(rear side of the Mechanical Chassis)
2. Unscrew the 3 screws (A) as shown in Fig. 2-6-1
and then remove the Capstan Unit from the lower
side of Mechanical Chassis.
(Installation)
1. Install the new Capstan Unit in reverse steps of the
removal..
Fig. 2-6-1
2-7. Replacement and Adjustment
of A/C Head Unit
(Removal)
1. Unscrew the spring screw(A) as shown in Fig.s
2-7-1 and 2-7-2 and then remove the A/C Head 1
Unit.
(Installation)
1. Install the A/C Head 1 Unit in reverse steps of the
removal. Tighten the screw (A) with 10cN·m
(1Kgf·m) torque.
2. Clean the surface of A/C Head.
Fig. 2-7-1
Fig. 2-7-2
Screw A
Capstan Unit
Screw A
A/C Head 1 Unit
A/C Head
Screw A
Summary of Contents for AJ-YA120AG
Page 3: ... 3 ...
Page 4: ... 4 AJ HD1200AE ...
Page 5: ... 5 ...
Page 6: ... 6 AJ YA120AG AJ YAD120AG ...
Page 8: ... 8 AJ HD1200AP ...
Page 9: ... 9 ...
Page 10: ... 10 AJ HD1200AE ...
Page 11: ... 11 ...
Page 12: ... 12 AJ YA120AG AJ YAD120AG ...
Page 13: ...FCD0405NTKK67E494E495 ...
Page 312: ...73 73 73 73 31 95 89 MECHANICAL CHASSIS ASSEMBLY 1 MPL 1 ...
Page 314: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Page 316: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Page 318: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Page 493: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Page 552: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Page 554: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Page 556: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Page 634: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...