![background image](http://html.mh-extra.com/html/omron/ns-rev-12/ns-rev-12_setup-manual_744517100.webp)
3-8 Installing the Controller Link Interface Unit
3-46
3-8-3
Installation Method for Controller Link Interface Unit
This section explains the method for mounting a Controller Link Interface Unit to the PT.
The Controller Link Interface Unit can be mounted to NS15, NS12 and NS10 PTs only. It
cannot be mounted to an NS8 or NS5 PT.
Precautions
for Safe Use
•
Do not touch the surface of the substrate or mounted devices with your bare
hands. Also, discharge static electricity from your body in advance.
•
After mounting the Controller Link Interface Unit to the PT, all fittings must
be tightened with the provided screws. Tighten the screws to a torque of
0.6 N
⋅
m.
•
Always turn OFF the power to PT before mounting or removing the Unit.
Follow the procedures and install the Unit correctly.
•
When the Controller Link Interface Unit is installed, the depth of the PT will
increase by 35 mm.
•
To install the Controller Link Interface Unit, secure sufficient space inside
the control panel beforehand.
Summary of Contents for NS - REV 12
Page 2: ......
Page 22: ...20 ...
Page 34: ...1 4 Procedure for Running NS series PTs 1 12 ...
Page 54: ...2 2 Part Names and Functions 2 20 ...
Page 116: ...3 11 RS 232C RS 422A Selector DIP Switch 3 62 ...
Page 144: ...4 4 Recommended Connector Cables 4 28 ...
Page 174: ...5 3 Connecting to Host via EtherNet IP 5 30 ...
Page 246: ...6 11 Verifying Tags 6 72 ...
Page 279: ...Appendix 2 Dimensions A 19 NS5 V1 V2 Cable Connection Dimensions ...
Page 332: ......
Page 333: ......