![background image](http://html.mh-extra.com/html/omron/ns-rev-12/ns-rev-12_setup-manual_744517244.webp)
6-11 Verifying Tags
6-70
6-11 Verifying Tags
If tags are used by projects in the NS-series PT, verification will be perform to check whether
the tag settings match the host tag settings (i.e., network variables).
Tags will be verified in the following cases.
•
When the NS-series PT is started
•
When ladder data is downloaded to the host (i.e., tag settings are updated)
1. The following screen will be displayed when the NS-series PT is started or ladder data is
downloaded to the host.
2. When verification has been completed, the user screen will be displayed if the tags of the
NS-series PT and the host match.
3. If the tags do not match, the Tag Comparison Results List will be displayed.
The following will be displayed in the
Verification Error Details
Column.
Item Details
Missing tag
A tag that is registered in the project is not registered in
the host.
Different data type
The data type set for the tag registered in the project is
different from the setting for the host tag.
Different array size
The setting for the number of elements for array tags
registered in the project is different from the setting for the
host tag.
Maximum number of tags
is exceeded
A tag is registered in the project, but the maximum number
of tags (10,000) is exceeded.
Communications error
An error occurred in communications with the host.
Summary of Contents for NS - REV 12
Page 2: ......
Page 22: ...20 ...
Page 34: ...1 4 Procedure for Running NS series PTs 1 12 ...
Page 54: ...2 2 Part Names and Functions 2 20 ...
Page 116: ...3 11 RS 232C RS 422A Selector DIP Switch 3 62 ...
Page 144: ...4 4 Recommended Connector Cables 4 28 ...
Page 174: ...5 3 Connecting to Host via EtherNet IP 5 30 ...
Page 246: ...6 11 Verifying Tags 6 72 ...
Page 279: ...Appendix 2 Dimensions A 19 NS5 V1 V2 Cable Connection Dimensions ...
Page 332: ......
Page 333: ......