5-33
5.44 Confirmation stamp
1. Remove the rear cover.
2. Remove the shielding plate R.
3. Disconnect the confirmation stamp connector (P19) on the connect A PCB.
4. Remove the ADF assembly.
5. Open the scanner cover.
6. Remove the stopper.
7. Remove the outer guide B.
8. Remove the confirmation stamp mounting screw, and then remove the stamp.
5.45 Lock lever shaft
1. Remove the ADF assembly.
2. Open the scanner cover.
3. Remove the stopper.
4. Remove the outer guide B.
5. Remove the two lock lever retainer mounting screws, and then remove the lock lever retainer.
6. Remove the spring, and then remove the lock lever shaft.
Summary of Contents for OKIOFFICE 120
Page 7: ...vi ...
Page 17: ...1 10 1 7 Dimensions Dimension in mm ...
Page 23: ...1 16 1 11 ID Label Specification 1 12 Labels location ...
Page 24: ...2 1 Section2 Machine Composition 2 1 Interconnect Block Diagram ...
Page 25: ...2 2 ...
Page 87: ...3 46 Unique Switch F 7 and F 9 Factory use only ...