After the instrument is installed, record the results. Check the boxes for checked items.
Fill in the blanks ( ) with parameter values.
Is the installation place proper?
Are the connections of Pump 1 and Pump 2 proper?
Check the drain condition in cleaning mode.
Is the date and time setting proper?
Is the processed size proper?
Size
At installation ( ) After adjustment ( )
Complete if size adjustment of any other items has been made.
Is the safety bevel amount proper?
Medium (Rear, Flat)
At installation ( ) After adjustment ( )
Medium (Front, Flat)
At installation ( ) After adjustment ( )
Medium (Rear, Bevel)
At installation ( ) After adjustment ( )
Medium (Front, Bevel)
At installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.
Is the safety bevel axis proper?
Rear, Flat
At installation ( ) After adjustment ( )
Front, Rear
At installation ( ) After adjustment ( )
Rear, Bevel
At installation ( ) After adjustment ( )
Front, Bevel
At installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.
Is the drilling proper?
Hole diameter
At installation ( ) After adjustment ( )
Hole depth
At installation ( ) After adjustment ( )
Hole/slot reference
At installation ( ) After adjustment ( )
Drill zero point
At installation ( ) After adjustment ( )
Drill hole vertical position
At installation ( ) After adjustment ( )
Front surface offset
At installation ( ) After adjustment ( )
Complete if the parameter setting of any other items has been changed.
Summary of Contents for ME 1200
Page 6: ...IV ...
Page 10: ...2 REQUIREMENTS Requirements ...
Page 58: ...50 CHECK AND ADJUSTMENT PROCEDURES Clock Check ...