10
INSTALLATION PROCEDURE
:
Pipe Arrangement
4
Connect the drain pipe to the aperture on the
bottom of the main body.
Push the hose adapter while aligning the hook
of the hose adapter with the indentations on the
underside aperture of the Me 1200 and turn the
light blue ring counterclockwise to secure the
adapter.
5
Connect the feedwater hose to the main body.
There are two inlets for feedwater hoses on the bottom of the main body. The front is the
connection for Pump 1 and the back is that for Pump 2.
1) Push the feedwater hose labeled as
into the rear inlet.
Push the hose until it clicks.
2) Push the feedwater hose labeled as
into the front inlet.
Push the hose until it clicks.
See “2.5.1 Pump and tank connection diagram” (page 8).
6
Put water into the tanks up to the guide
of water volume illustrated in the figure
to the right.
• Do not put a plastic sheet in the tank.
The pump fill may be blocked and it may cause malfunction.
• Do not allow the water level to rise over the maximum line.
Failure to do so may cause malfunction or water leakage.
• Be sure to securely close the cover of the tank.
Foam may overflow if the cover is held up.
Hook
Ring
1
2
Guide of
water volume
Summary of Contents for ME 1200
Page 6: ...IV ...
Page 10: ...2 REQUIREMENTS Requirements ...
Page 58: ...50 CHECK AND ADJUSTMENT PROCEDURES Clock Check ...