VAC 20
13 Appendix A: Installation Protocol
• Copy the installation protocol, fill it in and save it as a service record.
• For values, note the value in the result column, otherwise, a tick will suffice if the item has been performed or
considered.
NOTE!
If a value is outside the limit or a result is incorrect or missing, this must be rectified before the initial
start-up and normal operation.
Unit number
Date
Performed by
Description
Reference
Result
Notes
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight
Access for maintenance
(0.7 m in front of unit)
Mounting (check availability)
Maintenance switch
Installation room, ventil-
ation openings
Section 6.1 Indoor installation
Dust collector
Duct collector manual
Duct system
Pilot-start cable (option-
al)
Start and control unit
Start and control unit manual
Exhaust air duct directed
away from the unit
Compressed air
Airlines cleaned
Section 6.4 Compressed air installation
Air pressure
Section 6.4 Compressed air installation
Clean and dry air (ISO
8573-1, class 5)
Section 6.4 Compressed air installation
EN
27
Summary of Contents for VAC 20
Page 8: ...VAC 20 Figures 1 2 3 4 5 6 7 8 1 1 2 1 2 3 3 8 7 6 4 3 2 1 5 4 8...
Page 9: ...VAC 20 1 2 3 4 7 11 10 5 6 8 9 5 9...
Page 12: ...VAC 20 9 X U1 V1 W1 W2 U2 V2 X 10 35 ml ATF 70 85 mm 11 10mm 0 39 12 1 2 3 4 5 6 7 13 12...
Page 13: ...VAC 20 14 13...
Page 224: ...VAC 20 PL Opis Symbol Wynik Uwagi Wymiana silnika Punkt 8 8 o yska silnika 224...
Page 254: ...VAC 20 RU 13 A 5 1 5 1 5 2 1 3 3 0 7 5 2 1 4 2 6 1 4 2 4 2 6 6 4 254...
Page 255: ...VAC 20 6 4 ISO 8573 1 5 6 4 6 4 6 4 7 1 7 1 7 2 4 7 2 5 7 2 Y 7 2 D 7 2 RU 255...
Page 257: ...VAC 20 8 8 RU 257...
Page 290: ...www nederman com...