![background image](http://html.mh-extra.com/html/nec/n8100-1668f/n8100-1668f_user-manual_251356144.webp)
5-6 Installing the Operating System with Express Setup
About the System Partition Size
Required partition size =
size required to install OS + paging file size + dump file size + application size
Size required to install OS
= 8,000MB (Full Installation)
or
= 3,500MB (Server Core Installation)
Paging file size (recommended) = Installed memory size * 1.5
Dump file size
= Installed memory size + 300MB
Application size
= Required size
IMPORTANT:
The above-mentioned partition size is the minimum partition size
required for system installation. Ensure sufficient partition size for
system operation.
Following numbers are the recommended size.
– Full Installation: 32,768MB (32GB) or more
– Server Core Installation: 10,240MB (10GB) or more
*1GB = 1,024MB
The above-mentioned paging file size is recommended for
collecting debug information (memory dump). The paging file with
initial size large enough to store the dump file in the Windows
Partition is required.
Correct debug information might not be able to be collected due to
virtual memory shortage when the paging file is insufficient, so set
an enough size of the paging file with the entire system.
Regardless of the size of the mounted memory, or the Write
debugging information (type of memory dump), the maximum size
of the dump file is 'The size of the mounted 300MB'.
If you install any application program or the like, add necessary
space to the partition to install these programs.
Summary of Contents for N8100-1668F
Page 60: ...2 28 General Description This page is intentionally left blank ...
Page 146: ...5 8 Installing the Operating System with Express Setup Flow of Setup ...
Page 173: ...Installing the Operating System with Express Setup 5 35 Flow of Setup ...
Page 255: ...Installing and Using Utilities 6 13 Windows Server 2003 ...
Page 282: ...7 14 Maintenance This page is intentionally left blank ...
Page 339: ...Troubleshooting 8 57 When you use a remote console 6 Each tool is selected and it starts ...
Page 422: ...9 78 Upgrading Your Server This page is intentionally left blank ...
Page 440: ...C 2 IRQ This page is intentionally left blank ...
Page 464: ...D 24 Installing Windows Server 2008 R2 4 Activate Windows The Windows activation is complete ...
Page 495: ...Installing Windows Server 2008 E 29 4 Activate Windows The Windows activation is complete ...
Page 558: ...H 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 568: ...I 10 Accessing Power and Performance Data This page is intentionally left blank ...
Page 572: ...J 4 Product Configuration Record Table This page is intentionally left blank ...