Setting Up Your Server 3-15
10.
Pull out or push the server into the rack for several times to confirm that the slides move
smoothly.
11.
Connect the power cord and interface cables.
NOTE:
Before connecting cables, be sure to read precautions given in
"Connecting Peripheral Devices".
12.
Secure the server to the rack with two thumb nuts.
13.
Install the front bezel.
Now the installation is completed.
Screws
Summary of Contents for Express5800/R140a-4
Page 7: ......
Page 8: ......
Page 9: ......
Page 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Page 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Page 238: ...5 44 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 260: ...6 22 Installing and Using Utilities This page is intentionally left blank ...
Page 278: ...7 18 Maintenance This page is intentionally left blank ...
Page 352: ...8 74 Troubleshooting This page is intentionally left blank ...
Page 430: ...C 4 This page is intentionally left blank ...
Page 457: ...Installing Windows Server 2008 D 27 4 Activate Windows The Windows activation is complete ...