Upgrading Your Server 9-19
5.
Remove the rails from both sides of the dummy tray, and attach them to the tape device.
6.
Connect the power cable of the server, and connect the SCSI/USB cable coming with the
device.
7.
Insert the tape device into the server chassis until it is locked.
NOTE:
Some devices may protrude from the chassis by several or
several tens millimeters.
8.
Route the signal cable.
9.
Install the top cover.
Removal
Remove the 5-inch device in the reverse procedure of the installation.
Summary of Contents for Express5800/R140a-4
Page 7: ......
Page 8: ......
Page 9: ......
Page 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Page 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Page 238: ...5 44 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 260: ...6 22 Installing and Using Utilities This page is intentionally left blank ...
Page 278: ...7 18 Maintenance This page is intentionally left blank ...
Page 352: ...8 74 Troubleshooting This page is intentionally left blank ...
Page 430: ...C 4 This page is intentionally left blank ...
Page 457: ...Installing Windows Server 2008 D 27 4 Activate Windows The Windows activation is complete ...