Upgrading Your Server 9-27
Installation
Take the following steps to install the CPU.
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
2.
Pull out the server from the rack.
3.
Open the drive cover and logic cover.
4.
Remove two screws securing the support arm.
5.
Remove the support arm from the chassis.
6.
Remove the processor duct from the chassis.
7.
Locate the CPU socket which you are going to install CPU.
8.
Raise the locking lever on the socket.
IMPORTANT:
Open the lever until it stops. The bar can be opened to
approx. 120 degrees.
Summary of Contents for Express5800/120Rf-1
Page 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Page 154: ...4 58 Configuring Your Server This page is intentionally left blank ...
Page 236: ...6 26 Installing and Using Utilities This page is intentionally left blank ...
Page 248: ...7 12 Maintenance This page is intentionally left blank ...
Page 348: ...C 2 IRQ This page is intentionally left blank ...
Page 408: ...G 4 Product Configuration Record Table This page is intentionally left blank ...