9-4 Upgrading Your Server
PREPARING YOUR SYSTEM FOR UPGRADE
Follow the procedure below to prepare for installing or removing components.
1.
Prepare the Phillips screwdriver.
2.
Shut down the OS.
3.
Unlock the front bezel.
4.
Remove the front bezel.
5.
Press the POWER switch to power off the server (the POWER LED goes off).
6.
Remove all cables and power cords from the server.
Unlocked
Locked
Summary of Contents for Express5800/120Rf-1
Page 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Page 154: ...4 58 Configuring Your Server This page is intentionally left blank ...
Page 236: ...6 26 Installing and Using Utilities This page is intentionally left blank ...
Page 248: ...7 12 Maintenance This page is intentionally left blank ...
Page 348: ...C 2 IRQ This page is intentionally left blank ...
Page 408: ...G 4 Product Configuration Record Table This page is intentionally left blank ...