
Upgrading Your Server 9-9
Installation
Follow these steps to install the air duct.
1.
Holding the internal cables clear, place the air duct into the chassis.
2.
Adjust the air duct until the tab on the right end of the duct is aligned with the slot on the
chassis.
3.
Reinstall the side cover.
Insert the frame into
the hook on the
chassis.
Summary of Contents for Express 5800/120Lh
Page 1: ...N8100 941F 942F 943F NEC Express5800 120Lh User s Guide 1st Edition 08 2004 856 124032 101 00 ...
Page 138: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 174: ...7 12 Maintenance This page is intentionally left blank ...
Page 265: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 274: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 276: ...A 2 Specifications This page is intentionally left blank ...
Page 314: ...F 4 Product Configuration Record Table This page is intentionally left blank ...