
Start-up and Initial Preparation
38
EasyOne Pro™ / EasyOne Pro™ LAB
2.9 Switching the Device On, Functional Test
Open the main valve of the gas cylinder(s) completely.
Check the secondary pressure: for DLCO gas , it must be 4 to 5 bar, and
for FRC gas, it must be 3 bar (
EasyOne Pro™ LAB
only).
Turn on the mains power switch on the rear panel of the device.
Turn on the device with the power button: the green indicator is
illuminated.
After a short start-up phase, the initial screen will be displayed.
Note
If the initial screen appears and no error messages display, the
device is in perfect operating condition.
Fig. 2-22
Inserting the spirette™
Fig. 2-23
Power button
Summary of Contents for easyone pro
Page 1: ...Version V04b EasyOne Pro EasyOne Pro LAB Operator s Manual ...
Page 133: ...EasyOne Pro EasyOne Pro LAB 133 Specifications Power con sumption max 80 VA Life time 7 years ...
Page 138: ...Appendix 138 EasyOne Pro EasyOne Pro LAB Fig 12 1 ...