Matsushita Electric Works Fire & Security Technology AB
MEW00442
Rev: -
Operating Instructions EBL512, V1.44.x
105
32 Annual
control
The building occupier is highly recommended, once a year, to do
some tests, beside the monthly tests. To avoid the Fault tx output(s) to
be activated, they can be disabled via menu H8/S1 (or via an open
door, se chapter "Door open (Key switch)", page 25.).
Regarding the fault condition, see chapters "Fault", page 35 and "Fault
messages", page 35.
NOTE! Some faults may take a few minutes before they will be
activated.
Each control unit should be tested as follows:
•
Perform monthly test (menu H1).
•
Remove one battery fuse (F2 or F3 on the charger board
1557). The following fault message is to be shown:
FAULT: Battery not connected CU xx
NOTE! xx is depending on control unit.
•
Put back the fuse and acknowledge the fault (Menu H6).
•
Remove fuse F5 (
not F1 - F4
) on the connection board
1555. The following fault message is to be shown:
FAULT: monitored output 0, CU xx
NOTE! xx is depending on control unit.
•
Put back the fuse and acknowledge the fault.
When output units type 2262 / 2263 are installed:
•
Remove the battery fuse F3 on the rectifier p.c.b. The
following fault message is to be shown:
FAULT: Battery output unit xxxxxx
NOTE! xxxxxx is depending on output unit and control
unit.
•
Put back the fuse and acknowledge the fault.
•
Remove fuse F8 on the output p.c.b. The following fault
message is to be shown:
FAULT: Output 3, techn. no. xxxxxx
NOTE! xxxxxx is depending on output unit and control
unit.
•
Check the manual call points (the glass). Take required
measures. Use the manual call point alarm test key.
•
Check some control outputs. Are they activated according
to programmed control expressions?