
10.
Delivery Assembly
Delivery Belt
The Delivery Assembly is there to provide a moving platform for the processed sheets to collect
onto once finished. It consist of 2 main components, the delivery belt, and the delivery roller.
To set the delivery Belt tension correctly it is imperative that the 2 'Roller Drive Belts' are first
loosened to prevent excessive loads to the drive roller bearings.
Lower the delivery until the unit is vertical.
Remove the 4 fixing screws from the 'Upper End Panel' and
remove this panel.
Using a 5mm L-Series Allen key and suitable lever (a spanner is fine),
loosen the 2 button head screws that are used to secure each eccentric
idler tensioner (1 each side).
10.1.
10.1.1.
10.1.2.
10.1.3.
Page 50
FIG.10.1.2
FIG.10.1.3
Button Head Screw
(1 Each Side)
Upper End Panel
FOLDING