
Page 32
Engineering Set-Up
&
Calibration Techniques
Generally, Pre-Power Set-Up is made much easier if the Top Cover and the
Entry Guard are removed. An adequate supply of Test Sheets (Part
Number 170-004-01) should be made available for many of the set-up
procedures.
Ensure that test sheets are kept dry, flat and undamaged. Damp, bent,
buckled and damaged test sheets must not be used.
TEST SHEETS.
Autofold Pro
FOLDING