60
7.
When the unit test is completed, flashing of the
1 and
10 LEDs is stopped, and the D LINK LED
turns on.
• When completed: The D LINK LED turns on with the
ERR. LED off.
• When failed: The following LEDs turn on.
• Either of the
1 and
10 LEDs
• ERR. LED
• D LINK LED
If the unit test fails, replace the Ethernet cable and perform
the test again. If it fails again, the Ethernet adapter module
may have hardware failure. Please consult your local
Mitsubishi representative, with a detailed explanation of
the problem.
When completed
When failed
: On
: Flashing
: On
: Flashing