74
3.
Click the [Network Configuration Settings] button to set the parameters as follows.
4.
After setting, click the [End] button.
5.
Click the [Refresh Parameters] button to open the refresh parameter setting window. Set the
parameters as follows.
6.
After setting, click the [End] button.
7.
In the network parameter setting window, click the [End] button.
8.
Write the set parameters to the CPU module on the master station.
[Online]
[Write to PLC]
9.
Reset the CPU module or power off and on the system.
or Power OFF ON
RESET
Summary of Contents for NZ2GF-ETB
Page 1: ...CC Link IE Field Network Ethernet Adapter Module User s Manual NZ2GF ETB ...
Page 2: ......
Page 49: ...47 CHAPTER 4 PROCEDURE BEFORE THE OPERATION 4 4 1 Start Up Procedure Memo ...
Page 198: ...196 a Detail Setting ...
Page 246: ...244 Memo ...
Page 253: ......