MI 3309 DeltaGT
Autotest sequences
51
6.1.1 Carrying out a test sequence set with VDE Organizer
General meaning of keys during VDE Organizer autotest sequence:
/
Sets Organizer option or set value in selected (highlighted) item.
ESC
Cancels VDE sequence and returns to Main menu.
TEST
Starts / repeats selected measurement or proceeds to next step.
After the test sequence is finished the instrument proceeds to the ‘Autotest Result’ menu.
For more information refer to chapter
7 Working with Autotest results.
Note:
If any of the inspections are marked as failed or if any test fails the test sequence is
stopped and the instrument automatically goes to the
Result
menu.
6.1.1.1 Visual inspection
Measurement is described in chapter
5.2.1 Visual inspection.
Figure 6.2: VDE Organizer – Visual inspection menu
Options in Visual inspection menu:
PASS / FAIL
To be applied manually.
6.1.1.2 Earth continuity resistance measurement
The test is offered if it is applicable according to the VDE Organizer setting.
The measurement is described in chapter
5.2.2 Earth continuity resistance
.
Figure 6.3: VDE Organizer – Earth continuity starting screen
Options in Earth continuity starting screen:
/
Sets power cord length.
Note:
Earth continuity resistance limit is automatically set on base of set cord length.
Figure 6.4: VDE Organizer – Earth continuity result screen
Options in Earth continuity result screen:
NEXT
Proceeds to next step.
REPEAT
Repeats the test (in case of multiple earthed points). Highest result will
be stored.