![masosine SPS 100 User Manual Download Page 46](http://html.mh-extra.com/html/masosine/sps-100/sps-100_user-manual_1735328046.webp)
•
Hold the rotor vane in the slot of the gate, with the larger diameter end of the rotor bush away
from you. Position the rotor, the gate and the gate guide together. Push the assembly into
position. The gate and gate guide slide freely into their channel; the splines within the rotor hub
must be aligned with the shaft splines.
•
Ensure that the rotor is pushed all the way home.
Fitting the front bushing and the front liner
•
Push the front bushing into position, thick end (arrowed) first. (The two bushings are identical.)
Note
: Pumps are fitted with identical front and rear bushings.
•
Push the front liner into position, pushing evenly at both ends so that it does not jam. The anti-
rotation pins within the pump housing (arrowed) guarantee that the liner is properly positioned.
The two liners are identical.
46
m-SPS-en-08
Summary of Contents for SPS 100
Page 16: ...9 1 Dimensions in millimetres SPS 100 16 m SPS en 08 ...
Page 92: ...25 1 Pumps SPS 100 92 m SPS en 08 ...
Page 95: ...SPS 200 with cast iron power frame m SPS en 08 95 ...
Page 98: ...SPS 200 with stainless steel power frame 98 m SPS en 08 ...
Page 101: ...SPS 250 with stainless steel power frame m SPS en 08 101 ...
Page 104: ...SPS 300 with cast iron power frame 104 m SPS en 08 ...
Page 107: ...SPS 300 with stainless steel power frame m SPS en 08 107 ...
Page 110: ...SPS 400 with cast iron frame 110 m SPS en 08 ...
Page 113: ...SPS 400 with stainless steel frame m SPS en 08 113 ...
Page 116: ...SPS 500 with stainless steel power frame 116 m SPS en 08 ...