![masosine SPS 100 User Manual Download Page 11](http://html.mh-extra.com/html/masosine/sps-100/sps-100_user-manual_1735328011.webp)
7.16 Limit values for the pump
The pump’s maximum speed, maximum pressure and maximum temperature are included in the technical
data sheet supplied with each pump. These limit values must not be exceeded in any circumstances. This
applies in particular when using a frequency converter.
If pump is supplied without a drive, the following values apply:
SPS 100
SPS 200
SPS 250
SPS 300
SPS 400
SPS 500
Maximum
pressure*
10 bar/
145 psi
10 bar/
145 psi
15 bar/
217 psi
15 bar/
217 psi
15 bar/
217 psi
15 bar/
217 psi
Maximum
speed*
1000rpm
1000rpm
800rpm
600rpm
600rpm
600rpm
Maximum
temperature*
100C/
212F
100C/
212F
100C/
212F
100C/
212F
100C/
212F
100C/
212F
Ambient
temperature
-12C to
40C/10F to
104F
-12C to
40C/10F to
104F
-12C to
40C/10F to
104F
-12C to
40C/10F to
104F
-12C to
40C/10F to
104F
-12C to
40C/10F to
104F
* These limits may vary, depending on the drive, the application and the rating of the pump. (See your
purchase order confirmation, or contact MasoSine and quote your pump’s serial number.) On customer
request, higher pressures and temperatures are possible.
7.17 Maintenance and repair
Maintenance and repair work on the pump should only be carried out by trained service personnel, who
should have read and understood this manual prior to installing, operating or servicing this equipment.
Inform operating personnel before starting maintenance and repair work. Protect all plant parts and
operating media connected before and after the machine, such as compressed air and hydraulics, against
unintentional start-up. In all maintenance, inspection and repair work, switch the machine off and secure
the main switch against unintentional start-up.
Secure larger assemblies carefully to lifting gear. Check loosened screw connections for firm seating. Use
only original spare parts.
After maintenance work is finished, check the safety devices are functioning.
Bearings maintenance
•
The bearings of
SPS 100
pumps must be renewed after running for the periods shown in the table
below.
200 rpm
400 rpm
600 rpm
800 rpm
1,000 rpm
5 bar
10,000 hours
10,000 hours
6,986 hours
5,239 hours
4,191 hours
10 bar
2,079 hours
1,040 hours
693 hours
520 hours
416 hours
•
We recommend renewing the bearings of
SPS 200
pumps with
cast iron
power frames after
running for 10,000 hours at any pressure.
•
We recommend renewing the bearings of
SPS 200
pumps with
stainless steel
power frames after
running for the periods shown in the table below.
200 rpm
400 rpm
600 rpm
1,000 rpm
5 bar
10,000 hours
10,000 hours
10,000 hours
10,000 hours
10 bar
10,000 hours
10,000 hours
10,000 hours
6,260 hours
•
We recommend renewing the bearings of
SPS 250
pumps with
stainless steel
power frames after
running for 10,000 hours at any pressure.
•
We recommend renewing the bearings of
SPS 300
pumps with
cast iron
or
stainless steel
power
frames after running for 10,000 hours at any pressure.
•
We recommend renewing the bearings of
SPS 400
pumps with
cast iron
power frames after
running for the periods shown in the table below.
200 rpm
400 rpm
600 rpm
5 bar
10,000 hours
10,000 hours
10,000 hours
10 bar
10,000 hours
10,000 hours
10,000 hours
15 bar
10,000 hours
7,689 hours
5,126 hours
m-SPS-en-08
11
Summary of Contents for SPS 100
Page 16: ...9 1 Dimensions in millimetres SPS 100 16 m SPS en 08 ...
Page 92: ...25 1 Pumps SPS 100 92 m SPS en 08 ...
Page 95: ...SPS 200 with cast iron power frame m SPS en 08 95 ...
Page 98: ...SPS 200 with stainless steel power frame 98 m SPS en 08 ...
Page 101: ...SPS 250 with stainless steel power frame m SPS en 08 101 ...
Page 104: ...SPS 300 with cast iron power frame 104 m SPS en 08 ...
Page 107: ...SPS 300 with stainless steel power frame m SPS en 08 107 ...
Page 110: ...SPS 400 with cast iron frame 110 m SPS en 08 ...
Page 113: ...SPS 400 with stainless steel frame m SPS en 08 113 ...
Page 116: ...SPS 500 with stainless steel power frame 116 m SPS en 08 ...