© Martin Engineering GmbH
8
M3699UK-11/13
Installation
4.2.2
Installation of the spring tensioner
.
1. Prepare the installation openings for the scraper axis and pre-
pare installation openings for the tensioner according to Fig. 1.
Deburr all openings and boreholes.
2. Place the installation console with the safety bolts (Fig. 2) on
the operator side of the chute wall and fix it to the chute with
screws.
3. Repeat the steps 3 and 4 for installing the installation console
on the opposite side. Use the installation console with the shaft-
arresting mechanism (Fig. 4 on page 16)
NOTE
The dimensions of the installation openings for the spring and air
tensioners are different. Ensure that the correct dimensions are
used. Check the position of the conveyor belt scraper before con-
tinuing.
Abb. 2: Installing the installation console with safety bolts
Summary of Contents for DT2H
Page 1: ...Installation Manual M3699UK MARTIN DT2H Main Scraper...
Page 2: ...Martin Engineering GmbH M3699UK 11 13...
Page 10: ...Martin Engineering GmbH 8 M3699UK 11 13 Introduction...
Page 14: ...Martin Engineering GmbH 4 M3699UK 11 13 Installation preparation...
Page 38: ...Martin Engineering GmbH 28 M3699UK 11 13 Maintenance...
Page 42: ...Martin Engineering GmbH 32 M3699UK 11 13 Storage De installation Disposal...
Page 54: ...Martin Engineering GmbH 44 M3699UK 11 13 Part numbers...
Page 57: ...Martin Engineering GmbH 47 M3699UK 11 13 Notice 10 Notice...
Page 58: ...Martin Engineering GmbH 48 M3699UK 11 13...