Installation
4.2.5
Adjust the blade shaft parallel to the conveyor belt
Measure the distance on both sides between the scraper shaft and
the head drum or the counter pressure roller. The measurements on
both sides must be equal.
4.2.6
Levelling the blade shaft
Align the main scraper shaft horizontally to the head drum or check
that the cleaner blades are placed evenly against the conveyor belt.
Tighten the arresting screws of the tensioners.
Once all the measurements are correct and the main scraper is ad-
justed it can then be fixed in position; and if not, it should be rein-
stalled or re-positioned.
Abb. 9: Align the conveyor belt scraper shaft parallel to the head drum
(example)
Abb. 10: Aligning the scraper shaft (example)
NOTE
The following steps are necessary only if an air tensioner is being
used.
B
A = B
B
A
A
A = B
A = B
B
A
Summary of Contents for DT2H
Page 1: ...Installation Manual M3699UK MARTIN DT2H Main Scraper...
Page 2: ...Martin Engineering GmbH M3699UK 11 13...
Page 10: ...Martin Engineering GmbH 8 M3699UK 11 13 Introduction...
Page 14: ...Martin Engineering GmbH 4 M3699UK 11 13 Installation preparation...
Page 38: ...Martin Engineering GmbH 28 M3699UK 11 13 Maintenance...
Page 42: ...Martin Engineering GmbH 32 M3699UK 11 13 Storage De installation Disposal...
Page 54: ...Martin Engineering GmbH 44 M3699UK 11 13 Part numbers...
Page 57: ...Martin Engineering GmbH 47 M3699UK 11 13 Notice 10 Notice...
Page 58: ...Martin Engineering GmbH 48 M3699UK 11 13...