© Martin Engineering GmbH
21
M3699UK-11/13
Installation
8. If the wear and tear or bulk material accumulation is excessive
or other problems occur, refer to the information in section 4.4
“Installation checklist” or chapter 6 “Troubleshooting.
4.4
Installations - Check-list
If the test run of the conveyor belt scraper was not as expected, then
the “Installation checklist” table could help to find and solve the prob-
lem. If there are still problems, refer to chapter 6 "Troubleshooting".
Installation checklist
The main scraper must be installed on both sides according to the
measurements in section 4.2 et seq.
The tip of the main scraper cleaner blade must touch the conveyor
belt in the range of 51 and 102 mm after the vertical centre line of
the head drum.
The main scraper should not raise the conveyor belt (see Fig. 19).
The scraper blades must be installed in the centre of the conveyor
belt and/or head drum.
Tab. 4: Installation check-list
Summary of Contents for DT2H
Page 1: ...Installation Manual M3699UK MARTIN DT2H Main Scraper...
Page 2: ...Martin Engineering GmbH M3699UK 11 13...
Page 10: ...Martin Engineering GmbH 8 M3699UK 11 13 Introduction...
Page 14: ...Martin Engineering GmbH 4 M3699UK 11 13 Installation preparation...
Page 38: ...Martin Engineering GmbH 28 M3699UK 11 13 Maintenance...
Page 42: ...Martin Engineering GmbH 32 M3699UK 11 13 Storage De installation Disposal...
Page 54: ...Martin Engineering GmbH 44 M3699UK 11 13 Part numbers...
Page 57: ...Martin Engineering GmbH 47 M3699UK 11 13 Notice 10 Notice...
Page 58: ...Martin Engineering GmbH 48 M3699UK 11 13...