© Martin Engineering GmbH
7
M3699UK-11/13
Installation
3. Mark the vertical and horizontal centre line of the driving drum
on the operator side of the chute wall to determine the midpoint
(A) of the driving drum. The vertical line must run at right angles
to the conveyor line.
4. Mark one position at a distance of 51 to 102 mm in the direction
of conveyance starting from the point at which the conveyor belt
leaves the head drum (B).
5. At this position (C) mark one vertical line at a right angle to the
conveyor belt.
6. Take the dimension from Fig. 1 and mark the installation holes
in the spring tensioner.
NOTE
For installation behind a thrust roller in the direction of convey-
ance, draw one line vertically to the conveyor belt level at a dis-
tance of 51 mm from the midpoint of the roller.
Abb. 1: Creating the installation openings in the chute
NOTE
Martin Engineering recommends for improved maintenance and
repair access the installation of a MARTIN
®
inspection door.
438
Air tensioner
Blade tip
(4x Ø14)
Conveyor belt line
215
152
203
165
82
400
Spring tensioner
Blade tip
(4x Ø14)
Conveyor belt lin
215
152
165
165
76
(2 x R6)
(2 x R6)
A
A
B
B
C
C
Summary of Contents for DT2H
Page 1: ...Installation Manual M3699UK MARTIN DT2H Main Scraper...
Page 2: ...Martin Engineering GmbH M3699UK 11 13...
Page 10: ...Martin Engineering GmbH 8 M3699UK 11 13 Introduction...
Page 14: ...Martin Engineering GmbH 4 M3699UK 11 13 Installation preparation...
Page 38: ...Martin Engineering GmbH 28 M3699UK 11 13 Maintenance...
Page 42: ...Martin Engineering GmbH 32 M3699UK 11 13 Storage De installation Disposal...
Page 54: ...Martin Engineering GmbH 44 M3699UK 11 13 Part numbers...
Page 57: ...Martin Engineering GmbH 47 M3699UK 11 13 Notice 10 Notice...
Page 58: ...Martin Engineering GmbH 48 M3699UK 11 13...