© Martin Engineering GmbH
25
M3699UK-11/13
Maintenance
11. Monitor the scraper and test its cleaning performance.
CAUTION! DANGER OF DAMAGE!
Never operate the main scraper longer than 15 minutes on the
moving conveyor belt when it is not loaded. There is a risk of the
main scraper getting damaged and/or the conveyor belt getting
damaged by overheating.
Only operate the primary cleaner when the conveyor belt is run-
ning.
Summary of Contents for DT2H
Page 1: ...Installation Manual M3699UK MARTIN DT2H Main Scraper...
Page 2: ...Martin Engineering GmbH M3699UK 11 13...
Page 10: ...Martin Engineering GmbH 8 M3699UK 11 13 Introduction...
Page 14: ...Martin Engineering GmbH 4 M3699UK 11 13 Installation preparation...
Page 38: ...Martin Engineering GmbH 28 M3699UK 11 13 Maintenance...
Page 42: ...Martin Engineering GmbH 32 M3699UK 11 13 Storage De installation Disposal...
Page 54: ...Martin Engineering GmbH 44 M3699UK 11 13 Part numbers...
Page 57: ...Martin Engineering GmbH 47 M3699UK 11 13 Notice 10 Notice...
Page 58: ...Martin Engineering GmbH 48 M3699UK 11 13...