259
4. Remove the linchpin (6) from the tip of the position pin (5)
and remove the position pin (5).
5. Align hole (8) of the E-boom (7) with hole (9) of the
bracket.
6. Pass the position pin (5) removed in Step 4 through the
hole (9) of the bracket and fix the linchpin (6) to the tip of
the position pin (5).
Be sure to fix the position pin (5) with linchpin (6). If
the position pin (5) detaches during operation, there is
a risk of serious accident.
7. Remove the linchpin (11) from the tip of the position pin
(10) and remove the position pin (10).
8. Move the E-boom (7) to an angle appropriate for the work
and align the holes of the E-boom (7) and the bracket (1).
Depending on the boom angle, the E-boom and hook
may interfere with each other, potentially leading to
serious accidents. Be sure to adjust to an angle
appropriate for the work.
Summary of Contents for CC423S-1
Page 2: ......
Page 8: ...vi This Page Intentionally Left Blank...
Page 22: ...14 This Page Intentionally Left Blank...
Page 56: ...48 SAFETY LABEL LOCATIONS 2 2...
Page 59: ...51 24 Machine Mass 542 4773100 28 Working Radius Rated Total Load Chart 542 3582200...
Page 60: ...52 30 Safe Operation 557 3494500 31 Operating the Moment Limiter 542 2250000...
Page 194: ...186 This Page Intentionally Left Blank...
Page 232: ...224...
Page 248: ...240 This Page Intentionally Left Blank...
Page 251: ...243 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 255: ...247 4 WORKING RADIUS LIFTING HEIGHT 4 Fall Wire Rope...
Page 256: ...248 This Page Intentionally Left Blank...
Page 262: ...254 3 MONITOR INDICATION 1 Searcher hook selector switch 2 Searcher hook position display...
Page 276: ......
Page 277: ......
Page 278: ......