93
2.8 FUSE
Be sure to turn off the power (set the starter switch to the “OFF” position) before replacing a
fuse.
CAUTION
Protects electrical components and wires from being burnt out.
Be sure to replace the fuse if it is corroded, shows white powder, or sits loosely within its
holder.
When replacing a fuse, use a replacement which has the same capacity.
The fuse box is installed under the operator’s seat.
Fuse capacity and circuit name
No.
Fuse
capacity
Connection table
(1)
10A
Emergency operation power supply
(2) 5A Operation
switch
(3)
20A
Controller I/O power supply
(4)
5A
Controller K15, Monitor power supply
(5)
10A
Headlamps, Boom working lamp
(6)
―
―
(7) 10A Horn
(8)
―
―
(9)
―
―
(10)
―
―
(11) 5A PPC
lock
(12)
―
―
(13)
―
―
(14) 5A
Layered rotating lamp, Audible
warning equipment
(15) 5A
Controller control power supply,
Monitor control power supply
(16)
10A
ECU output power supply
(17)
5A
IOT unit power supply
(18)
10A
Starter SW B
(19)
5A
Starter SW ACC secondary side
(20)
5A
Starter SW C secondary side
Summary of Contents for CC423S-1
Page 2: ......
Page 8: ...vi This Page Intentionally Left Blank...
Page 22: ...14 This Page Intentionally Left Blank...
Page 56: ...48 SAFETY LABEL LOCATIONS 2 2...
Page 59: ...51 24 Machine Mass 542 4773100 28 Working Radius Rated Total Load Chart 542 3582200...
Page 60: ...52 30 Safe Operation 557 3494500 31 Operating the Moment Limiter 542 2250000...
Page 194: ...186 This Page Intentionally Left Blank...
Page 232: ...224...
Page 248: ...240 This Page Intentionally Left Blank...
Page 251: ...243 2 SPECIFICATION DIMENSIONAL DRAWING...
Page 255: ...247 4 WORKING RADIUS LIFTING HEIGHT 4 Fall Wire Rope...
Page 256: ...248 This Page Intentionally Left Blank...
Page 262: ...254 3 MONITOR INDICATION 1 Searcher hook selector switch 2 Searcher hook position display...
Page 276: ......
Page 277: ......
Page 278: ......