215585
46
Revision A
$
%
Figure 3.92: Alignment Valve Fitting
6.
Remove the cap from fitting (A).
7.
Remove the plug from hose (B). Install hose to fitting (A)
as shown.
$
%
&
'
Figure 3.93: Completion Assembly Plumbing
8.
Install steel line (A) from port A on the completion
assembly to tee fitting (D).
9.
Install steel line (B) from port B on the completion assembly
to tee fitting (C).
$
%
&
Figure 3.94: Transport Swing Cylinder
10. Attach hose (A) to steel line connecting to port D of
transport swing control.
11. Attach hose (B) to steel line connecting to port C of
transport swing control.
12. Secure hoses (A) and (B) together with a cable tie.
NOTE:
Ensure that direction arrow on check valve (C) points
toward tee fitting.