215585
11
Revision A
$
%
Figure 3.6: Top Shield
–
Left of Center-Link
8.
Install top shield (B) and secure with four M10 hex head
bolts (A) and flat washers. Torque to 28.5 Nm (21 lbf·ft).
NOTE:
If transport is also being installed, leave bolts (A) loose.
These bolts will be tightened when installing the lighting
harness.
$
%
&
Figure 3.7: Lift Cylinder Lock-Out Valve and
Adjuster Bolt
9.
Close lock-out valve (A) on each rotary disc pull-type lift
cylinder by turning the handle to the horizontal position.
Repeat on opposite side.
10. Turn adjuster bolt (B) to set dimension (C) to 130 mm
(5 1/8 in.). Repeat on opposite side.
•
Turn bolt clockwise (towards spring) to increase float
•
Turn bolt counterclockwise (away from spring) to
decrease float
$
%
Figure 3.8: Adjuster Bolt Cover Plate
11. Reposition cover plate (A) over float spring adjuster bolt as
shown. Secure cover plate (A) by tightening bolt (B). Repeat
on opposite side.