214603
220
Revision A
1008809
A
B
Figure 4.109: Hydraulic Center-Link
7.
Adjust position of the center-link cylinder (A) with the
REEL UP, REEL DOWN, AND HEADER TILT switches
on the GSL until the hook is above the header
attachment pin.
IMPORTANT:
Hook release must be down to enable self-locking
mechanism. If the release is open (up), manually push it
down after hook engages header pin.
8.
Lower center-link (A) onto the header with the REEL
DOWN switch on the GSL until it locks into position
(hook release [B] is down).
9.
Check that center-link is locked onto header by
pressing the REEL UP switch on the GSL.
CAUTION
Check to be sure all bystanders have cleared the area.
1008946
A
Figure 4.110: Ground Speed Lever
10. Press HEADER UP switch (A) to raise the header to
maximum height.
11. If one end of the header does
NOT
fully raise, rephase
the lift cylinders as follows:
a.
Press and hold the HEADER UP switch until both
cylinders stop moving.
b.
Continue to hold the switch for 3
–
4 seconds.
Cylinders are now phased.
NOTE:
It may be necessary to repeat this procedure if there is
air in the system.
Summary of Contents for M205
Page 3: ...Declaration of Conformity 1025029 ...
Page 4: ...1025030 ...
Page 20: ......
Page 440: ......
Page 462: ......
Page 511: ...windshield wipers 56 INDEX ...
Page 512: ......