
Table 2-3
Sequence of steps
(continued)
Main task
Chapter number
Subtask [section/page]
Power and ground
cable installation
4
“Power wiring (External battery - PDP)” (p. 4-7)
“Power wiring (PDP - PI/100)” (p. 4-11)
Internal cable
installation
“Subrack alarm wiring” (p. 4-31)
“Station alarm wiring” (p. 4-35)
External cable
installation
“Miscellaneous Discrete Inputs/Outputs (MDIs/MDOs)”
(p. 4-54)
“User byte interfaces (G.703/V.11)” (p. 4-59)
“TI-DS1 Station clock I/O interface (100/110
or
“TI-E1 Station clock I/O interface (120
or
“TI-E1 Station clock I/O interface (75
“LAN 10/100 Base-T interface” (p. 4-73)
Fiber cabling
“Optical circuit packs” (p. 4-78)
“Gigabit Ethernet circuit packs” (p. 4-87)
“Fiber engineering rules” (p. 4-89)
Side cover plates
(optional)
Rack doors
(optional)
Powering
5
“Switching on and testing the supply voltage” (p. 5-4)
Fan unit test
WaveStar
®
CIT
installation
NE software
installation
“NE software installation” (p. 5-19)
Circuit pack
installation
“Mounting the circuit packs” (p. 5-52)
Physical
installation check
“Physical installation check” (p. 5-60)
General information
Sequence of steps
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
2-17