Result:
If the creation of the MS-SPRing/BLSR protection group was successful, a
DCC termination provisioning message appears indicating that the LAPD role has
been set on the user side.
.................................................................................................................................................................................................
12
Click
OK
, then click
Close
.
.................................................................................................................................................................................................
13
Repeat
to
for all other NEs in the ring via remote login.
To do that, enter the following:
•
The NE
TID
as
NE Name
•
LambdaUnite(R) MSS
as
NE Type
•
OSI
as
Connection Type
.
To verify that the MS-SPRing/BLSR setup is correct perform the steps mentioned
below.
.................................................................................................................................................................................................
14
In the
WaveStar
®
CIT
System View
, select
View
→
Rings
→
Ring Map...
.
.................................................................................................................................................................................................
15
Click
Ring {Ring ID}
on the left-hand side of the window and then the
Select
button.
Result:
All NEs of the ring should be displayed on the right side of the window.
.................................................................................................................................................................................................
16
In the
WaveStar
®
CIT
System View
of NE-A, select
View
→
Protection...
.
.................................................................................................................................................................................................
17
Select the existing
2F MS-SPRing#
(SDH) or
2F BLSR#
(SONET) in the
Ptn Grp
tab
on the left-hand side of the window and click the
Select
button.
.................................................................................................................................................................................................
18
Select the
Protection Group
tab.
.................................................................................................................................................................................................
19
Check that the
RING Node APS (Automatic Protection Switch) State
field displays
“idle”.
.................................................................................................................................................................................................
20
Click
Close
.
.................................................................................................................................................................................................
21
Click the
Alarm List
button and check that there are no “Ring Protection Switch
Suspended” alarms.
Network establishment and testing
2-fiber MS-SPRing/BLSR test setup
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
10-33