
5
5
Power, software and circuit pack
installation
Overview
.................................................................................................................................................................................................................................
Purpose
This chapter describes
•
the powering of the
LambdaUnite
®
MultiService Switch (MSS) system,
•
the
WaveStar
®
CIT and NE software installation,
•
the circuit pack installation, and
•
two final tests that should be performed to end the physical installation part.
Assumption
All NEs must be mounted and cabled correctly (see chapters 3 and 4).
Contents
Switching on and testing the supply voltage
Software and circuit pack installation
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
5-1