Part I: Physical and power installation
Overview
.................................................................................................................................................................................................................................
Purpose
This part of the
LambdaUnite
®
MSS Installation Guide contains the physical
installation of the racks and subracks, the system cabling and powering, the
WaveStar
®
CIT and NE software installation and the installation of circuit packs, side panels and
doors.
Contents
This part of the document contains the following chapters:
•
Chapter 1
Safety
•
Chapter 2
General information
•
Chapter 3
Mechanical installation
•
Chapter 4
System cabling and final assembly
•
Chapter 5
Power, software and circuit pack installation
•
Chapter 6
Exit checklist – Part I
Entry checklist
The following provides a checklist to be completed prior to performing the physical
and power installation. Verify that each procedure has been completed. Check off and
initial the item.
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
I-1